DPHS Accident Assessment (Protective Action Worksheet)

  • PROTECTIVE ACTION WORKSHEET

  • MM slash DD slash YYYY
  • :
  •  
  • 2. Current conditions:
  • PLANT CRITICAL SAFETY FUNCTIONS

    (functions required to prevent major release of radiation to environment)
  • SUBCRITICALLY (SHUTDOWN REACTOR POWER):

  • CORE COOLING (CORE DECAY HEAT REMOVAL):

  • HEAT SINK (TRANSFER HEAT OUT OF SYS):

  • INTEGRITY (COOLING SYS PIPES INTACT):

  • Containment (PREVENT BREACH TO OUTSIDE):

  • LATEST PLANT MONITOR VALUES

  •  
  • (assume 4 hour release if unknown)

  • 4. Special Considerations - (Relative to Evacuation)
  •  
  • 6. Dose Levels PROJECTED by DPHS
  • RADIUS

  • Dose or Dose Rate
  • Evac Time
  • Dose or Dose Rate
  • Evac Time
  • Dose or Dose Rate
  • Evac Time
  • Dose or Dose Rate
  • Evac Time
  • Downwind Distance

  • Dose or Dose Rate
  • Evac Time
  • Dose or Dose Rate
  • Evac Time


  • Note: Standard plant recommendation at General Emergency
  • Dose or Dose Rate
  • Evac Time


  • Note: Plant second recommendation if situation warrants
  •  
  • 7. DPHS RECOMMENDATIONS:

    SEABROOK TOWNS


  • ERPA A
    Seabrook
    Hampton Falls
    Hampton Beach




  • ERPA C
    Kensington
    South Hampton




  • ERPA D
    North Hampton
    Hampton Residents




  • ERPA F
    Brentwood
    East Kingston
    Exeter
    Kingston
    Newfields
    Newton




  • ERPA G
    Greenland
    New Castle
    Portsmouth
    Rye
    Stratham